1. Specification
No | Items | Specification |
1 | Main Frame | Galvanized cold-formed C section & U section light steel |
2 | Steel coin thickness | 0.6-2.5mm |
3 | Surface galvanized | 180-320g/m2 |
4 | Wall system | steel frame + insulation + wall baseboard + wall cladding |
5 | Floor system | steel frame + floor baseboard + floor sheathing |
6 | Roof system | steel frame + insulation + roof baseboard + roof covering |
7 | Insulation | EPS, XPS, rock wool, glass wool |
8 | Ceiling | floor frame + ceiling board |
9 | Connection | Bolt /Screw/Rivet/Pin |
10 | Window | PVC/Aluminum alloy/Plastic-steel |
11 | Door | Steel/Wooden/PVC/composite |
12 | Electrical and plumbing | Chinese standard |
13 | Interior decoration | Simple/Normal/Luxury |
14 | Others | Kitchen/Bathroom/Electric equipment/others |
No | Items | Specification | |
1 | Main Steel Frame | Column | Q235, Q345 Welded H Section Steel |
Beam | Q235, Q345 Welded H Section Steel | ||
2 | Secondary Frame | Purlin | Q235 C and Z purlin |
Knee brace | Q235 Angle Steel | ||
Tie Rod | Q235 Circular Steel Pipe | ||
Brace | Q235 Round Bar | ||
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | ||
3 | Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel / Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | ||
3 | Accessories | Window | Aluminum Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | ||
Rainspout | PVC | ||
4 | Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
5 | Wind Resistance Grade | 12 Grades | |
6 | Earthquake-resistance | 8 Grades | |
7 | Structure Usage | Up to 50 years | |
8 | Finishing Options | The vast array of colors and textures available | |
9 | Paint Options | Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc, etc.) Or Galvanized. |
2. Detailed Description
(1) Features
Primary Framing Elements-columns, beams and all primary members are made by H section steels- hot rolled section steel/ welded section steel, which will be bolted together at the site. A factory primer and facing paintings are applied to get the better anti-rusting effect of primary framing elements.
Secondary Framing-Purlin, Tie Bar, Roof, and Wall Support are formed as secondary framing
1 - Ridge Ventilator: It is mostly used in machine shops because the exhaust gas generated in the machine shop is more likely to pollute the environment. The ridge ventilator can carry out the circulation of air very well.
2 - Fascia: It can prevent people from falling off the roof, play the role of waterproofing the roof, and decorate the facade of the building.
3 - Translucent Sheeting: Increase the light transmittance to make the indoor light transmittance meet the specification requirements.
4 - Roof Sheeting: It blocks rain, snow, and wind. Ensure a comfortable and dry working environment in the workshop/warehouse.
5 - Purlins: Support the roof sheeting and the fixed position of the roof sheeting.
6 - Insulation: Insulate, keep the indoor temperature.
7 - Girts: Support wall panel, fixed position of the wall panel.
8 - Clean Colorbond Wall Cladding: Roof and Wall are covering of color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of the structural building to protect it against bad weather or to make it look more attractive and last for generations.
9 - Floor Decking: A two-story or multi-story building, which is poured on the floor slab to serve as a formwork. Save time and improve construction progress.
10 - Windows: Increase light transmittance. According to customer requirements, there are plastic steel windows, aluminum alloy windows, etc.
11 - Doors: Easy access. According to customer requirements, there are composite panel doors, electric shutter doors and so on.
(2) Designing technique notes
1 - Materials: Steel grade should be Q235B or above
2 - Frame lifetime: Normally 50 years
3 - Loads: Wind load, Snow load, Dead load, Live load, Seismic load, etc. according to project local environment status
4 - Unit transport length ≤ 12m
5 - Pre-punched: pre-punched on the column, beam, and purlin in the factory
6 - Connection: Q235 high strength anchor bolts for foundation and frame join point
7 - Foundation: pre-embedded parts on accurate position
8 - Pre-assembly: Before shipment, it should be pre-assembly in our factory
9 - Rust cleaning on steel surface: rust removed by hand is not permitted
10 - Anticorrosion treatment: Zinc galvanized or painting. The galvanizing thickness should be no less than 15μm
11 - Painting: 2 primer painting (epoxy resin primer), 2 finish painting(alkyd resin paint) on steel
12 - Fire resistance: Normally 2 hours for the column, 1 hour for beam
13 - Wall surface: Decide what kind of materials according to the local environment
14 - Roof surface: Decide what kind of materials according to the local environment
(3) Application
Industry: workshop, warehouse, and other industrial facilities.
Commerce: Mall, hotel, exhibition hall, hospital, office building.
Public: the social activity center, school, library, sports stadium, church, etc.
(4) Drawings Display
(5) According to customer needs, we can equip you with photovoltaic panels
3. Steel Structure Process
3.1 Prepare raw materials: cut steel plate or use customized size H section steel and angle steel, round tube, round steel, square tube, etc.;
3.2 Assembly and welding: our welders will follow the drawings to assemble the steel members and weld them together as an entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding, this is the first quality check)
3.3 Sandblast: After finish welding and polishing, our sandblast effect can reach internation 2.5 high grade, very good for resisting rust; (Secondary quality check)
3.4 Paint: Within 2 hours after sandblasting, all the steel members should be painted. A client can choose any color and any brand of paint. (The third quality check)
3.5 Inspect the goods by client: After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame.
3.6 Packing and loading: If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )
4. Advantages of Using Steel in Building Structures
4.1 Adaptability:
Steel can be adjusted and changed according to the designer's requirements. The frame which is made from steel can be repositioned. For example; wall frames made from the steel can be altered easily to widen space and create a new interior layout of the building. At the same time, it helps to extend the lifespan of the structure.
4.2 Beauty:
It gives a freedom to explore ideas to create stylish shapes and textures of the building. It offers a stylish way to create large, column-free interiors, that give the building a sense of openness.
4.3 Cost-Effective:
It is lightweight when compared with timber and RCC and also easier to transport, reduces fuel cost and accelerates project schedules. Also, it is energy efficient and can be recycled, and create minimum raw material waste.
4.4 Ductility:
It can be rolled, cut and turned into a variety of sizes and shapes without changing the composition or physical property through steel.
4.5 Durability:
It withstands extreme forces and weather conditions such as strong wind, earthquakes, and heavy snow. They are not affected by bugs, termites, fungi, etc. They are more fire-resistant as compared with wooden frames.
Using steel in residential, commercial or industrial structures is definitely a worthy investment.
5. Market
6. Our Service
6.1 Pre-sale Service
- Consultant service(Answering client's questions)
- Primary design plan(Free)
- Assisting the client to choose a suitable construction plan
- Price calculation
- Business&technology discussion
- Submission of support reaction data for foundation
- Submission of the construction drawing
- Providing requirements for embedding
- Construction Manual
- Fabrication&Packing
- Delivery
- Other requirements by Clients
- We can support you full training service of how to construct and assembly on site.
- Solution 1: if you have your own construction team with engineers, plumbers, electricians, and supervisors, we can support you 2 professional technician for the necessary assembly training on-site.
- Solution 2: If you don't have a construction team, we recommend you employ local construction workers for assembly, we can support you all the technician engineer and supervisor for training and construction assist. But the relevant charges will be on your account.
- Periodical following-up our client's projects
- Feedback and good communication
- 50 years warranty for VISTA steel frame
7. FAQ
7.1 What's the quality assurance you provided and how do you control quality?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in-process materials, validated or tested materials, finished goods, etc.
7.2 Do you offer guiding installation on site overseas for warehouse building?
Yes, we can provide the service of installation, supervision, and training by extra. We can send our professional technical engineer to supervise installation on site overseas. They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algeria, Malawi, Thailand, and Ghana.
7.3 What is your main market?
Guided by global field of vision, our products have been exported to many countries and regions with its good quality and good service, such as France, UAE, South East Asia, Africa and so on. We will be glad to establish sincere business cooperation with you in the near future.
7.4 How to pack the products?
We use a standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
7.5 Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirements. They use software: Auto CAD, PKPM, MTS, 3D3S, Search, Tekla Structures(X steel)V12.0.etc.
7.6 Payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balance before loading by TT or L/C.
7.7 What is the delivery time?
It depends on order quantities and how complicated it is. Generally speaking, the delivery time will be within 30 to 50days after prepayments.
8. Customized design is welcome, it would be better if you could provide the following information:
8.1 Location (where will be built?) _____country, area
8.2 Size:Length*width*height _____mm*_____mm*_____mm
8.3 Wind load (max.Wind speed) _____kn/m2, _____km/h, _____m/s
8.4 Snow load (max.Snow height) _____kn/m2, _____mm
8.5 Anti-earthquake _____level
8.6 Brickwall needed or not If yes, 1.2m high or 1.5m high
8.7 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok.The cost of the latter will be much lower than that of the former.
8.8 Door quantity & size _____units, _____(width)mm*_____(height)mm
8.9 Window quanity & size _____units, _____(width)mm*_____(height)mm
8.10 Crane needed or not If yes, _____units, max.Lifting weight____tons;Max.Lifting height _____m
Welcome to visit our factory, we assure that our products will satisfy your needs with designs, competitive performance price ratio and best services.